Latest News   |  New Life Spectrum CICHLID now available in 600g Jar

Install a U/V

Choose U/Vs with adequate wattage.  If you think you need a 15 watt we suggest you install a 30 watt. 

TIP  When installing U/V, if space is limited and you have insufficient room to extract the tube and sleeve,  put demountable couplings on the inlet and outlet of the U/V, but with valves  if U/V is sited below water level.  This will allow to remove U/V unit to change tubes and sleeves. 

TUBES SHOULD BE CHANGED EVERY 6 MTHS/SLEEVES ANNUALLY